Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
2920 S PARK AV
Address NEW:
2920 S PARK AV
Apply Date:
09/05/2025
Applicant:
Description:
Extending Sanitary Sewer into ROW to tap into main.

Permit Reviews

Permit Number - TR-ROW-0925-01094
Permit Status: Inspections
Permit Description: Extending Sanitary Sewer into ROW to tap into main.
Start Date Submittal Complete Date Status  
09/05/2025 RIGHT-OF-WAY REVIEW v.1 09/09/2025 REQUIRES RESUBMIT Review Details
09/16/2025 RIGHT-OF-WAY REVIEW v.2 09/16/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01094
Permit Status: Inspections
Permit Description: Extending Sanitary Sewer into ROW to tap into main.
Total Outstanding Activity Conditions - 6
Date Name
09/08/2025 Traffic control set-up approved between 9AM - 3:30PM
09/08/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/16/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
09/16/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
09/16/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/11/2025 The following extended traffic control set-up times were approved: 24 hr for Pedestrian Detour Closure

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01094
Permite Description: Extending Sanitary Sewer into ROW to tap into main.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/29/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
11/05/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01094
Permit Description: Extending Sanitary Sewer into ROW to tap into main.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/27/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/14/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/30/2025 TRSP - ROW - Backfill - Placement/Compaction Passed

Scheduled Inspections

Scheduled Inspections - TR-ROW-0925-01094
Status: Inspections
Description: Extending Sanitary Sewer into ROW to tap into main.
Scheduled Date Description Entered By Entered Date
12/12/2025 TRSP - ROW - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
RC - E 39TH ST - S PARK AVE - HARD CLOSURE - 25-003 RC UPDATED_V1.PDF DOCUMENTS VIEW
SEWER LINE_V1.PDF DOCUMENTS VIEW