Permit: TR-ROW-0925-01092
Permit Details
Apply Date:
09/04/2025
Applicant:
Anthony Chamberlain
Description:
CONTRACTOR WILL BE BORING AND DRAWING PRIMARY POWER FROM SUB-STATION TO JOB SITE
Permit Reviews
Permit Number - TR-ROW-0925-01092
Permit Status: Inspections
Permit Description: CONTRACTOR WILL BE BORING AND DRAWING PRIMARY POWER FROM SUB-STATION TO JOB SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/08/2025 | REQUIRES RESUBMIT |
| 09/09/2025 | RIGHT-OF-WAY REVIEW v.2 | 09/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01092
Permit Status: Inspections
Permit Description: CONTRACTOR WILL BE BORING AND DRAWING PRIMARY POWER FROM SUB-STATION TO JOB SITE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/05/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/05/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/05/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/09/2025 | Pre-Activity Meeting with Inspections |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0925-01092
Permite Description: CONTRACTOR WILL BE BORING AND DRAWING PRIMARY POWER FROM SUB-STATION TO JOB SITE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0925-01092
Permit Description: CONTRACTOR WILL BE BORING AND DRAWING PRIMARY POWER FROM SUB-STATION TO JOB SITE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/06/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 10/15/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |