Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
3940 E PASEO GRANDE
Apply Date:
09/27/2024
Applicant:
Andrew Ruiz
Description:
Replace Concrete Collars on Manholes on Alvernon Way Northbound inside lane at Paseo Grande and in front of address 3940 E Paseo Grande. Excavation: 3x3 Setup 9AM to 3:30PM

Permit Reviews

Permit Number - TR-ROW-0924-01141
Permit Status: Complete
Permit Description: Replace Concrete Collars on Manholes on Alvernon Way Northbound inside lane at Paseo Grande and in front of address 3940 E Paseo Grande. Excavation: 3x3 Setup 9AM to 3:30PM
Start Date Submittal Complete Date Status  
09/27/2024 RIGHT-OF-WAY REVIEW v.1 10/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0924-01141
Permit Status: Complete
Permit Description: Replace Concrete Collars on Manholes on Alvernon Way Northbound inside lane at Paseo Grande and in front of address 3940 E Paseo Grande. Excavation: 3x3 Setup 9AM to 3:30PM
Total Outstanding Activity Conditions - 2
Date Name
09/30/2024 PRE-CON/PAVEMENT/SIDEWALK
09/30/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0924-01141
Permite Description: Replace Concrete Collars on Manholes on Alvernon Way Northbound inside lane at Paseo Grande and in front of address 3940 E Paseo Grande. Excavation: 3x3 Setup 9AM to 3:30PM
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/12/2024 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0924-01141
Permit Description: Replace Concrete Collars on Manholes on Alvernon Way Northbound inside lane at Paseo Grande and in front of address 3940 E Paseo Grande. Excavation: 3x3 Setup 9AM to 3:30PM
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/07/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/12/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
05/01/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3940 E PASEO GRANDE SITE_V1.PDF DOCUMENTS VIEW
3940 E PASEO GRANDE TCP1_V1.PDF DOCUMENTS VIEW
3940 E PASEO GRANDE TCP2_V1.PDF DOCUMENTS VIEW