Permit: TR-ROW-0924-01095
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8690 E GOLF LINKS RD
Address NEW:
8690 E GOLF LINKS RD
Apply Date:
09/23/2024
Applicant:
ANGEL MORALES
Description:
Remove 2 existing ramps and Install 2 new standard ramps.***
Permit Reviews
Permit Number - TR-ROW-0924-01095
Permit Status: Complete
Permit Description: Remove 2 existing ramps and Install 2 new standard ramps.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/30/2024 | APPROVED |
| 09/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/25/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0924-01095
Permit Status: Complete
Permit Description: Remove 2 existing ramps and Install 2 new standard ramps.***
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/24/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/24/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 09/24/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0924-01095
Permit Description: Remove 2 existing ramps and Install 2 new standard ramps.***
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | job to start 10/7, need to confirm work hours allowed | |
| 10/08/2024 | TRSP - ROW - SITE INSPECTION | Passed | forms and Subgrade approved for curb pour | |
| 10/21/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all asphalt and sidewalk compaction tested and completed | |
| 10/21/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | barricades in place 10/3-10/15, RoW completed, all barricades removed | |
| 10/21/2024 | TRSP - ROW - Barricade Takedown | Passed | all traffic control elements removed | |
| 10/28/2024 | TRSP - ROW - Final | Passed | all work complete, site clean, and landscape restored |