Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
6275 E SPEEDWAY BL
Apply Date:
09/11/2024
Applicant:
Desert Barricades LLC
Description:
SOW We will be removing the existing light pole and disposing of including the Mobilite small cell equipment. Will then install a crossover plate and new light pole. Reinstall any signage that was on pole, that is not Mobilite.

Permit Reviews

Permit Number - TR-ROW-0924-01039
Permit Status: Complete
Permit Description: SOW We will be removing the existing light pole and disposing of including the Mobilite small cell equipment. Will then install a crossover plate and new light pole. Reinstall any signage that was on pole, that is not Mobilite.
Start Date Submittal Complete Date Status  
09/11/2024 RIGHT-OF-WAY REVIEW v.1 09/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0924-01039
Permit Status: Complete
Permit Description: SOW We will be removing the existing light pole and disposing of including the Mobilite small cell equipment. Will then install a crossover plate and new light pole. Reinstall any signage that was on pole, that is not Mobilite.
Total Outstanding Activity Conditions - 2
Date Name
09/12/2024 Traffic control set-up approved between 9AM - 3:30PM
09/12/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0924-01039
Permit Description: SOW We will be removing the existing light pole and disposing of including the Mobilite small cell equipment. Will then install a crossover plate and new light pole. Reinstall any signage that was on pole, that is not Mobilite.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/25/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/01/2024 TRSP - ROW - Barricade - Setup/Routine Passed
10/02/2024 TRSP - ROW - Barricade Takedown Passed
10/02/2024 TRSP - ROW - Final Passed