Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0924-01035
Permit Details
Apply Date:
09/10/2024
Applicant:
Desert Barricades LLC
Description:
We will be removing the existing cell site equipment and the streetlight pole. We will install a new crossover plate and reinstall the new street light pole to match previous pole before cell site was added. Meter pedestal will also be removed and conduits capped 6" UG.
Permit Reviews
Permit Number - TR-ROW-0924-01035
Permit Status: Complete
Permit Description: We will be removing the existing cell site equipment and the streetlight pole. We will install a new crossover plate and reinstall the new street light pole to match previous pole before cell site was added. Meter pedestal will also be removed and conduits capped 6" UG.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/18/2024 | REQUIRES RESUBMIT |
09/18/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0924-01035
Permit Status: Complete
Permit Description: We will be removing the existing cell site equipment and the streetlight pole. We will install a new crossover plate and reinstall the new street light pole to match previous pole before cell site was added. Meter pedestal will also be removed and conduits capped 6" UG.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
09/11/2024 | PRE-CON/PAVEMENT/SIDEWALK |
09/11/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0924-01035
Permit Description: We will be removing the existing cell site equipment and the streetlight pole. We will install a new crossover plate and reinstall the new street light pole to match previous pole before cell site was added. Meter pedestal will also be removed and conduits capped 6" UG.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/08/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
11/08/2024 | TRSP - ROW - Final | Passed |