Permit: TR-ROW-0924-01030
Permit Details
Apply Date:
09/10/2024
Applicant:
Dan Padilla
Description:
Air - Vacuum Excavation of 2 Off Road Utility Potholes for the design phase of City of Tucson HSIP HAWK Pedestrian Crossing Project at 36th St and Martin Luther King Jr Way.
Permit Reviews
Permit Number - TR-ROW-0924-01030
Permit Status: Inspections
Permit Description: Air - Vacuum Excavation of 2 Off Road Utility Potholes for the design phase of City of Tucson HSIP HAWK Pedestrian Crossing Project at 36th St and Martin Luther King Jr Way.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0924-01030
Permit Status: Inspections
Permit Description: Air - Vacuum Excavation of 2 Off Road Utility Potholes for the design phase of City of Tucson HSIP HAWK Pedestrian Crossing Project at 36th St and Martin Luther King Jr Way.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
09/12/2024 | Bus Stops and Routes |
09/12/2024 | Pre-Activity Meeting. |
09/12/2024 | Traffic control set-up approved between 9AM - 3:30PM |
10/22/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0924-01030
Permit Description: Air - Vacuum Excavation of 2 Off Road Utility Potholes for the design phase of City of Tucson HSIP HAWK Pedestrian Crossing Project at 36th St and Martin Luther King Jr Way.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |