Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0924-01006
Permit Details
Apply Date:
09/03/2024
Applicant:
Jamie Hoyt
Description:
Bridges Pearl 24-026 - 4 ADA ramps, remove and reconstruct curb for turnouts on 36th st. Remove of 2 ADA, and replace asphalt on Multi use path. Asphalt pavement for new turnouts.
Permit Reviews
Permit Number - TR-ROW-0924-01006
Permit Status: Inspections
Permit Description: Bridges Pearl 24-026 - 4 ADA ramps, remove and reconstruct curb for turnouts on 36th st. Remove of 2 ADA, and replace asphalt on Multi use path. Asphalt pavement for new turnouts.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/06/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/06/2024 | APPROVED |
09/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/05/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0924-01006
Permit Status: Inspections
Permit Description: Bridges Pearl 24-026 - 4 ADA ramps, remove and reconstruct curb for turnouts on 36th st. Remove of 2 ADA, and replace asphalt on Multi use path. Asphalt pavement for new turnouts.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
09/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
09/06/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
09/06/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0924-01006
Permit Description: Bridges Pearl 24-026 - 4 ADA ramps, remove and reconstruct curb for turnouts on 36th st. Remove of 2 ADA, and replace asphalt on Multi use path. Asphalt pavement for new turnouts.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/25/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
09/26/2024 | TRSP - ROW - Bituminous Treatment | Passed |