Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2820 S 12TH AV
Address NEW:
2820 S 12TH AV
Apply Date:
09/05/2023
Applicant:
Peter Johnson
Description:
Installation of underground conduit pathways for fiber optic cable to connect the Santa Cruz Water site to City network.

Permit Reviews

Permit Number - TR-ROW-0923-01122
Permit Status: Complete
Permit Description: Installation of underground conduit pathways for fiber optic cable to connect the Santa Cruz Water site to City network.
Start Date Submittal Complete Date Status  
09/05/2023 RIGHT-OF-WAY REVIEW v.1 09/08/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0923-01122
Permit Status: Complete
Permit Description: Installation of underground conduit pathways for fiber optic cable to connect the Santa Cruz Water site to City network.
Total Outstanding Activity Conditions - 3
Date Name
09/05/2023 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
09/05/2023 Contact ADOT
09/05/2023 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0923-01122
Permite Description: Installation of underground conduit pathways for fiber optic cable to connect the Santa Cruz Water site to City network.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/25/2024 TRSP - ROW - Recurring N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0923-01122
Permit Description: Installation of underground conduit pathways for fiber optic cable to connect the Santa Cruz Water site to City network.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/24/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
SANTA CRUZ SOW_V1.PDF DOCUMENTS VIEW