Permit: TR-ROW-0923-01120
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
10208 E CALLE ESTRELLA FUGAZ
Address NEW:
10208 E CALLE ESTRELLA FUGAZ
Apply Date:
09/05/2023
Applicant:
Jude Blue
Description:
HOA PUEBLO ESTRELLA SPOT ONE 40YD OT ROFF AT 10208 E CALLE ESTRELLA FUGAZ IN FRONT OF WASH
Permit Reviews
Permit Number - TR-ROW-0923-01120
Permit Status: Complete
Permit Description: HOA PUEBLO ESTRELLA SPOT ONE 40YD OT ROFF AT 10208 E CALLE ESTRELLA FUGAZ IN FRONT OF WASH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2023 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | 09/05/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0923-01120
Permit Status: Complete
Permit Description: HOA PUEBLO ESTRELLA SPOT ONE 40YD OT ROFF AT 10208 E CALLE ESTRELLA FUGAZ IN FRONT OF WASH
| Date | Description | Comments |
|---|---|---|
| 09/05/2023 | * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 09/05/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0923-01120
Permite Description: HOA PUEBLO ESTRELLA SPOT ONE 40YD OT ROFF AT 10208 E CALLE ESTRELLA FUGAZ IN FRONT OF WASH
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2023 | TRSP - ROW - Notice of Completion | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0923-01120
Permit Description: HOA PUEBLO ESTRELLA SPOT ONE 40YD OT ROFF AT 10208 E CALLE ESTRELLA FUGAZ IN FRONT OF WASH
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2023 | TRSP - ROW - Recurring | Passed | ||
| 11/01/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |