Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
3434 E 22ND ST
Address NEW:
3434 E 22ND ST
Apply Date:
08/27/2026
Applicant:
Christian Aguilar
Description:
Julia Keen - South Jones ROW > Funded by City of Tucson Water Mini Grants Program > Collaboration with neighborhood community body to install 4 back of curb rainwater basins > In Total: - 82 linear feet of basin length.?Project site is located on the southwest corner of the parcel across the Citation Wash in a non designated parcel or Right-of-way.

Permit Reviews

Permit Number - TR-ROW-0826-00948
Permit Status: In review
Permit Description: Julia Keen - South Jones ROW > Funded by City of Tucson Water Mini Grants Program > Collaboration with neighborhood community body to install 4 back of curb rainwater basins > In Total: - 82 linear feet of basin length.?Project site is located on the southwest corner of the parcel across the Citation Wash in a non designated parcel or Right-of-way.
Start Date Submittal Complete Date Status  
08/27/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0826-00948
Permit Status: In review
Permit Description: Julia Keen - South Jones ROW > Funded by City of Tucson Water Mini Grants Program > Collaboration with neighborhood community body to install 4 back of curb rainwater basins > In Total: - 82 linear feet of basin length.?Project site is located on the southwest corner of the parcel across the Citation Wash in a non designated parcel or Right-of-way.
Total Outstanding Activity Conditions - 4
Date Name
09/02/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/02/2026 PAVEMENT MORATORIUM
09/02/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/02/2026 Traffic Control set-up approved between 7AM - 5PM