Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
5902 E 23RD ST
Address NEW:
5902 E 23RD ST
Apply Date:
08/27/2026
Applicant:
Desert Barricade / Eric Horne
Description:
Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. Continuation of permit TR-ROW-0226-00221.

Permit Reviews

Permit Number - TR-ROW-0826-00947
Permit Status: Inspections
Permit Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. Continuation of permit TR-ROW-0226-00221.
Start Date Submittal Complete Date Status  
08/27/2026 RIGHT-OF-WAY REVIEW v.1 09/29/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0826-00947
Permit Status: Inspections
Permit Description: Application is for utility work involving a contractor who will be performing maintenance and repairs on water pipes within various locations throughout the neighborhood. The work will be concentrated in residential areas. Continuation of permit TR-ROW-0226-00221.
Total Outstanding Activity Conditions - 11
Date Name
09/01/2026 CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
09/01/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/01/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/01/2026 Traffic Control set-up approved between 7AM - 5PM
09/01/2026 Traffic control set-up approved between 9AM - 3:30PM
09/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/24/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.
09/24/2026 Any water line abandoned in place within the public right-of-way shall remain under the ownership and responsibility of the utility owner. If future utility work, public improvements, or other authorized construction activities conflict with the abandoned facilities, the utility owner shall, upon request, remove or relocate the abandoned facilities at no cost to the City
09/24/2026 Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.
09/24/2026 Survey Monuments If survey markers are damaged or disturbed during construction, the contractor shall have the markers reset by a registered land surveyor in accordance with Arizona Revised Statutes (A.R.S.) ยง 33-103.
09/24/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 70920 - SAN PAULO VILLAGE PH 2C - ALL PAGES_V1.PDF DOCUMENTS VIEW
DB 70920 - SAN PAULO VILLAGE PH 2C - OVERVIEW_V1.PDF DOCUMENTS VIEW