Permit: TR-ROW-0826-00946
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
9441 E LURLENE DR
Address NEW:
9441 E LURLENE DR
Apply Date:
08/27/2026
Applicant:
Adrian Dominguez
Description:
4 sidewalk areas to be repaired
Permit Reviews
Permit Number - TR-ROW-0826-00946
Permit Status: Inspections
Permit Description: 4 sidewalk areas to be repaired
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/18/2026 | APPROVED |
| 08/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/31/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00946
Permit Status: Inspections
Permit Description: 4 sidewalk areas to be repaired
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/31/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/31/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/31/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0826-00946
Permit Description: 4 sidewalk areas to be repaired
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | mobilized for panel demolition this morning, with sidewalk closed, signed, set up at nearest driveways for pedestrian reroute to other side of the road | |
| 09/23/2026 | Passed | demo work of out of spec sidewalk panels is in progress, with sidewalk closures in place | ||
| 09/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Adrian, job will start on Wednesday | |
| 09/28/2026 | Passed | newly poured sections have been checked for grades and cross slopes, ramp/driveway was poured to match existing | ||
| 09/30/2026 | Passed | no work was performed after hours and job has been completed | ||
| 09/29/2026 | Passed | areas for removal marked out by NoV, reviewed specifications with Adrien on site | ||
| 09/28/2026 | TRSP - ROW - Notice of Completion | Passed | all sections marked out by notice of violation have been corrected either with new panels or surface grinding. All sections altered have been checked for grades and cross slopes and approved. | |
| 09/30/2026 | Passed | all new concrete has been inspected for grades, cracks or chips, all work approved |