Permit: TR-ROW-0826-00945
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
10725 E OLD SPANISH TR
Address NEW:
10725 E OLD SPANISH TR
Apply Date:
08/27/2026
Applicant:
Alex Dietz
Description:
Install new 6-inch Ductile Iron water line within a pressure reducing zone to transition from existing 12-inch water line to a 6-inch water line (City of Tucson Water - Avenida Los Reyes - CIP No. PRJ001127 - Tucson Water PM - Jeffrey Hancock - Jeffrey.Hancock@tucsonaz.gov)
Permit Reviews
Permit Number - TR-ROW-0826-00945
Permit Status: Inspections
Permit Description: Install new 6-inch Ductile Iron water line within a pressure reducing zone to transition from existing 12-inch water line to a 6-inch water line
(City of Tucson Water - Avenida Los Reyes - CIP No. PRJ001127 - Tucson Water PM - Jeffrey Hancock - Jeffrey.Hancock@tucsonaz.gov)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/08/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/09/2026 | REQUIRES RESUBMIT |
| 09/09/2026 | RIGHT-OF-WAY REVIEW v.3 | 09/10/2026 | APPROVED |
| 08/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00945
Permit Status: Inspections
Permit Description: Install new 6-inch Ductile Iron water line within a pressure reducing zone to transition from existing 12-inch water line to a 6-inch water line
(City of Tucson Water - Avenida Los Reyes - CIP No. PRJ001127 - Tucson Water PM - Jeffrey Hancock - Jeffrey.Hancock@tucsonaz.gov)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/28/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/10/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 09/10/2026 | Message Boards required to be placed 5 days in advance of work and be Maintained during work Do to Low visibility concerns |
| 09/10/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/10/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0826-00945
Permit Description: Install new 6-inch Ductile Iron water line within a pressure reducing zone to transition from existing 12-inch water line to a 6-inch water line
(City of Tucson Water - Avenida Los Reyes - CIP No. PRJ001127 - Tucson Water PM - Jeffrey Hancock - Jeffrey.Hancock@tucsonaz.gov)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | mobilization has begun with westbound travel lane closed for initial excavations. Advanced warning, signs and flaggers are in place for traffic control. | |
| 09/21/2026 | Passed | Job has mobilized with traffic control in place using closed travel lane and flaggers. Excavation down to existing waterline is complete along with saw cuts across the roadway. Backfill stock piles are secured with waddles. | ||
| 09/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on-site meeting with Cameron, barricade set up will be scheduled for Monday |