Permit: TR-ROW-0826-00938
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW)
Address:
4755 N ORACLE RD
Address NEW:
4755 N ORACLE RD
Apply Date:
08/26/2026
Applicant:
Eric Ross
Description:
Guardrail Repair
Permit Reviews
Permit Number - TR-ROW-0826-00938
Permit Status: Inspections complete
Permit Description: Guardrail Repair
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00938
Permit Status: Inspections complete
Permit Description: Guardrail Repair
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/28/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/28/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-ROW-0826-00938
Permit Description: Guardrail Repair
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2026 | Passed | Site safety visit and Precon for them to replace replace the guard rail they'll be using flaggers on the set up they're gonna start this Wednesday the 16th of this month | ||
| 10/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | All work completed barricades have not been removed | |
| 10/27/2026 | TRSP - ROW - SITE INSPECTION | Passed | All work completed barricades have not been removed | |
| 10/27/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | All work completed barricades have not been removed | |
| 10/27/2026 | Passed | All work completed barricades have not been removed | ||
| 10/27/2026 | Passed | All work completed barricades have not been removed replacing guard rail | ||
| 11/02/2026 | TRSP - ROW - Notice of Completion | Passed | all guard rail repair completed | |
| 10/27/2026 | Passed | All work completed barricades have not been removed | ||
| 11/02/2026 | Passed | all work completed |