Permit: TR-ROW-0826-00923
Permit Details
Apply Date:
08/20/2026
Applicant:
ANGEL MORALES
Description:
KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.
Permit Reviews
Permit Number - TR-ROW-0826-00923
Permit Status: Inspections
Permit Description: KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00923
Permit Status: Inspections
Permit Description: KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/24/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/28/2026 | Potholing operations shall be conducted in a manner that maintains public safety and minimizes impacts to traffic. All excavations shall be properly protected, backfilled, and restored upon completion. The permittee shall be responsible for repairing any settlement or pavement failure resulting from potholing activities |
| 08/28/2026 | The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0826-00923
Permite Description: KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| N/A | Requested | |||
| N/A | Requested | |||
| N/A | Requested | |||
| N/A | Scheduled | |||
| N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0826-00923
Permit Description: KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | ||
| 10/22/2026 | TRSP - ROW - Notice of Completion | Passed | ||
| 10/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/28/2026 | TRSP - ROW - SITE INSPECTION | Passed |
Scheduled Inspections
Scheduled Inspections - TR-ROW-0826-00923
Status: Inspections
Description: KE&G is potholing one 8" hole at each location for Tucson Water to provide access to their 24" and 16" DIP main. We will install a 6" riser pipe and valve box per TW standard. No work will be done to the main. This is to allow an anode to touch the pipe for NDT Vibracoustic testing. We will backfill the hole per COT/TW Standards. The work is expected to take 2-4 hours at each site.