Permit: TR-ROW-0826-00919
Permit Details
Apply Date:
08/19/2026
Applicant:
Description:
Thoroughly clean existing sewer line and manhole benches. Install approximately 256 LF of 6" CIPP. Reinstate all active HCS's. Remove existing cleanout and install new terminal manhole 09/29/26- TCP and commentary page where send for revision.
Permit Reviews
Permit Number - TR-ROW-0826-00919
Permit Status: In revision
Permit Description: Thoroughly clean existing sewer line and manhole benches. Install approximately 256 LF of 6" CIPP. Reinstate all active HCS's. Remove existing cleanout and install new terminal manhole
09/29/26- TCP and commentary page where send for revision.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/18/2026 | APPROVED |
| 09/25/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00919
Permit Status: In revision
Permit Description: Thoroughly clean existing sewer line and manhole benches. Install approximately 256 LF of 6" CIPP. Reinstate all active HCS's. Remove existing cleanout and install new terminal manhole
09/29/26- TCP and commentary page where send for revision.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/24/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: In Revision
Permit Number: TR-ROW-0826-00919
Permit Description: Thoroughly clean existing sewer line and manhole benches. Install approximately 256 LF of 6" CIPP. Reinstate all active HCS's. Remove existing cleanout and install new terminal manhole
09/29/26- TCP and commentary page where send for revision.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |