Permit: TR-ROW-0826-00897
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
1924 W CALLE CIELO DE ORO
Address NEW:
1924 W CALLE CIELO DE ORO
Apply Date:
08/17/2026
Applicant:
Alexis Otero-Morales
Description:
Installation of a public sanitary sewer main, including associated trenching and utility work, at San Xavier***
Permit Reviews
Permit Number - TR-ROW-0826-00897
Permit Status: Inspections
Permit Description: Installation of a public sanitary sewer main, including associated trenching and utility work, at San Xavier***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/08/2026 | APPROVED |
| 08/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/20/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00897
Permit Status: Inspections
Permit Description: Installation of a public sanitary sewer main, including associated trenching and utility work, at San Xavier***
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/19/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 08/19/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 08/19/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 08/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/19/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |