Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
115 S LINDA AV
Address NEW:
115 S LINDA AV
Apply Date:
08/12/2026
Applicant:
Andrik Valdez
Description:
Continuation of permit TR-ROW-0326-00338. Crew will be relocate the site fence on the west side of Linda to the back of the light rail power poles and temporarily close the sidewalk along the west side. If this permit can be for 90 days it should take us to the end of construction.

Permit Reviews

Permit Number - TR-ROW-0826-00889
Permit Status: Fees due
Permit Description: Continuation of permit TR-ROW-0326-00338. Crew will be relocate the site fence on the west side of Linda to the back of the light rail power poles and temporarily close the sidewalk along the west side. If this permit can be for 90 days it should take us to the end of construction.
Start Date Submittal Complete Date Status  
08/12/2026 RIGHT-OF-WAY REVIEW v.1 09/08/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0826-00889
Permit Status: Fees due
Permit Description: Continuation of permit TR-ROW-0326-00338. Crew will be relocate the site fence on the west side of Linda to the back of the light rail power poles and temporarily close the sidewalk along the west side. If this permit can be for 90 days it should take us to the end of construction.
Total Outstanding Activity Conditions - 5
Date Name
08/17/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/17/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/08/2026 The following extended traffic control set-up times were approved:
09/08/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14