Permit: TR-ROW-0826-00888
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW)
Address:
1100 E MITCHELL ST
Address NEW:
1100 E MITCHELL ST
Apply Date:
08/11/2026
Applicant:
Cynthia Smith
Description:
Irrigation update, Passive rainwater harvesting, boulders and planting.
Permit Reviews
Permit Number - TR-ROW-0826-00888
Permit Status: Inspections complete
Permit Description: Irrigation update, Passive rainwater harvesting, boulders and planting.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00888
Permit Status: Inspections complete
Permit Description: Irrigation update, Passive rainwater harvesting, boulders and planting.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/18/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/18/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/18/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-ROW-0826-00888
Permit Description: Irrigation update, Passive rainwater harvesting, boulders and planting.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2026 | Passed | The curb matches the drawings 10 feet of either side of this curb are part of the right of way. I inspected that part and the private property inspector from building services been passed his side as well. | ||
| 10/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | All work completed for the right of way | |
| 10/27/2026 | TRSP - ROW - SITE INSPECTION | Passed | All work completed for the right of way | |
| 10/27/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | All work completed for the right of way it’s for a renewal | |
| 10/27/2026 | Passed | All work completed for the right of way | ||
| 10/27/2026 | Passed | All work completed for the right of way | ||
| 10/27/2026 | TRSP - ROW - Notice of Completion | Passed | All work completed for the right of way | |
| 10/27/2026 | Passed | All work completed for the right of way | ||
| 10/27/2026 | Passed | All work completed for the right of way |