Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Approved
Type:
Right-of-Way (ROW)
Address NEW:
9009 E BROADWAY BL
Apply Date:
08/06/2026
Applicant:
Description:
JOC 326005 Sewer Main Rehab, MH Rehab (4932-33) CIPP, Bench Rehab, Collars, Frames and Covers, Adjustments

Permit Reviews

Permit Number - TR-ROW-0826-00879
Permit Status: Approved
Permit Description: JOC 326005 Sewer Main Rehab, MH Rehab (4932-33) CIPP, Bench Rehab, Collars, Frames and Covers, Adjustments
Start Date Submittal Complete Date Status  
09/01/2026 RIGHT-OF-WAY REVIEW v.2 09/15/2026 REQUIRES RESUBMIT Review Details
09/21/2026 RIGHT-OF-WAY REVIEW v.3 09/21/2026 APPROVED Review Details
08/06/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0826-00879
Permit Status: Approved
Permit Description: JOC 326005 Sewer Main Rehab, MH Rehab (4932-33) CIPP, Bench Rehab, Collars, Frames and Covers, Adjustments
Total Outstanding Activity Conditions - 7
Date Name
08/07/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/07/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/07/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/03/2026 The following extended traffic control set-up times were approved:
09/03/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
09/03/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
09/03/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14