Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
5849 S 6TH AV
Address NEW:
5849 S 6TH AV
Apply Date:
08/04/2026
Applicant:
Alexis Otero-Morales
Description:
installing the sewer in the bike path and then doing a full moratorium patch.***

Permit Reviews

Permit Number - TR-ROW-0826-00873
Permit Status: Complete
Permit Description: installing the sewer in the bike path and then doing a full moratorium patch.***
Start Date Submittal Complete Date Status  
08/04/2026 RIGHT-OF-WAY REVIEW v.1 08/24/2026 REQUIRES RESUBMIT Review Details
08/26/2026 RIGHT-OF-WAY REVIEW v.2 08/27/2026 REQUIRES RESUBMIT Review Details
08/31/2026 RIGHT-OF-WAY REVIEW v.3 09/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0826-00873
Permit Status: Complete
Permit Description: installing the sewer in the bike path and then doing a full moratorium patch.***
Total Outstanding Activity Conditions - 7
Date Name
08/05/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/05/2026 Traffic control set-up approved between 9AM - 3:30PM
08/05/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/05/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/05/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/02/2026 Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift
09/02/2026 S 6th Av is under a pavement moratorium. Any disturbance of existing asphalt shall require a 2-inch mill and overlay for a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0826-00873
Permit Description: installing the sewer in the bike path and then doing a full moratorium patch.***
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/08/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
5849 S 6TH AV COMMENT RESPONSE-2-2026-08-31_V1.PDF DOCUMENTS VIEW
JWCIVIL71_V3.PDF DOCUMENTS VIEW
5849 S 6TH AV COMMENT RESPONSE-2026-08-26_V1.PDF DOCUMENTS VIEW
5853 UNIT 1 SITE PLAN UNIT 1 AND UNIT 2_V1.PDF DOCUMENTS VIEW
DESIGN PLAN-2-014-2026 WATER PLAN 5849 S 6TH AVE-C1_V1.PDF DOCUMENTS VIEW