Permit: TR-ROW-0825-01043
Permit Details
Apply Date:
08/22/2025
Applicant:
Description:
AZTEC will perform 31 utility potholes for the design of water main replacements in the Barrio Viejo sub-division.
Permit Reviews
Permit Number - TR-ROW-0825-01043
Permit Status: Complete
Permit Description: AZTEC will perform 31 utility potholes for the design of water main replacements in the Barrio Viejo sub-division.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2025 | REQUIRES RESUBMIT |
| 08/25/2025 | RIGHT-OF-WAY REVIEW v.3 | 08/28/2025 | APPROVED |
| 08/22/2025 | RIGHT-OF-WAY REVIEW v.2 | 08/22/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0825-01043
Permit Status: Complete
Permit Description: AZTEC will perform 31 utility potholes for the design of water main replacements in the Barrio Viejo sub-division.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/25/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 08/25/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/25/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/02/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726 |
| 09/02/2025 | Multiple jurisdictions |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0825-01043
Permit Description: AZTEC will perform 31 utility potholes for the design of water main replacements in the Barrio Viejo sub-division.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/03/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 11/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/24/2025 | TRSP - ROW - Final | Passed |