Permit: TR-ROW-0825-01031
Permit Details
Apply Date:
08/20/2025
Applicant:
Daniel Gerritson
Description:
Will saw cut asphalt approx 6’x6’ and jackhammer asphalt to remove and expose soil. Excavate to expose clay sewer pipe approx 4’—7.5’ in depth. Once sewer is exposed will remove damaged portion of pipe and repair (Spot Repair) up to 4 feet with ABS Material. . Backfill Native Soil and equipment tamper soil. Hot Asphalt replacement.
Permit Reviews
Permit Number - TR-ROW-0825-01031
Permit Status: Complete
Permit Description: Will saw cut asphalt approx 6’x6’ and jackhammer asphalt to remove and expose soil.
Excavate to expose clay sewer pipe approx 4’—7.5’ in depth. Once sewer is exposed will remove damaged portion of pipe and repair (Spot Repair) up to 4 feet with ABS Material. . Backfill Native Soil and equipment tamper soil. Hot Asphalt replacement.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0825-01031
Permit Status: Complete
Permit Description: Will saw cut asphalt approx 6’x6’ and jackhammer asphalt to remove and expose soil.
Excavate to expose clay sewer pipe approx 4’—7.5’ in depth. Once sewer is exposed will remove damaged portion of pipe and repair (Spot Repair) up to 4 feet with ABS Material. . Backfill Native Soil and equipment tamper soil. Hot Asphalt replacement.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/21/2025 | Emergency – After the fact permit |
| 08/21/2025 | LOCAL street Pavement Moratorium |
| 08/21/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0825-01031
Permit Description: Will saw cut asphalt approx 6’x6’ and jackhammer asphalt to remove and expose soil.
Excavate to expose clay sewer pipe approx 4’—7.5’ in depth. Once sewer is exposed will remove damaged portion of pipe and repair (Spot Repair) up to 4 feet with ABS Material. . Backfill Native Soil and equipment tamper soil. Hot Asphalt replacement.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/22/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/22/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/22/2025 | TRSP - ROW - Final | Passed |