Permit: TR-ROW-0825-00996
Permit Details
Apply Date:
08/06/2025
Applicant:
Rene Andrade
Description:
20'-0" curb cut for new drive-way.
Permit Reviews
Permit Number - TR-ROW-0825-00996
Permit Status: Complete
Permit Description: 20'-0" curb cut for new drive-way.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2025 | RIGHT-OF-WAY REVIEW v.3 | 09/23/2025 | APPROVED |
| 08/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/06/2025 | REQUIRES RESUBMIT |
| 09/17/2025 | RIGHT-OF-WAY REVIEW v.2 | 09/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0825-00996
Permit Status: Complete
Permit Description: 20'-0" curb cut for new drive-way.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/18/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/18/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/18/2025 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
| 09/23/2025 | The following extended traffic control set-up times were approved: 24 hr. Pedestrian detour route Traffic control setup only |
| 09/23/2025 | Bike Lane Access and Accommodation |
| 09/23/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0825-00996
Permit Description: 20'-0" curb cut for new drive-way.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/15/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/22/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 10/22/2025 | TRSP - ROW - Final | Passed |