Permit: TR-ROW-0825-00995
Permit Details
Apply Date:
08/06/2025
Applicant:
Description:
325002 Site 1 - Install approximately 430 LF of 8" Cured in Place Pipe from MH 9864-27 to MH 9864-26A. Bench rehab, MH adjustment, and new frame and cover will be completed on MH 9864-27.
Permit Reviews
Permit Number - TR-ROW-0825-00995
Permit Status: Complete
Permit Description: 325002 Site 1 - Install approximately 430 LF of 8" Cured in Place Pipe from MH 9864-27 to MH 9864-26A. Bench rehab, MH adjustment, and new frame and cover will be completed on MH 9864-27.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 08/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0825-00995
Permit Status: Complete
Permit Description: 325002 Site 1 - Install approximately 430 LF of 8" Cured in Place Pipe from MH 9864-27 to MH 9864-26A. Bench rehab, MH adjustment, and new frame and cover will be completed on MH 9864-27.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/06/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/06/2025 | Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones. |
| 08/06/2025 | Residential Access to be maintained at all times, unless alternative access is provided and Coordinated with Residence. |
| 08/06/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/06/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0825-00995
Permit Description: 325002 Site 1 - Install approximately 430 LF of 8" Cured in Place Pipe from MH 9864-27 to MH 9864-26A. Bench rehab, MH adjustment, and new frame and cover will be completed on MH 9864-27.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/02/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/02/2025 | TRSP - ROW - Final | Passed |