Permit: TR-ROW-0824-00976
Permit Details
Apply Date:
08/22/2024
Applicant:
Blake Olofson
Description:
ROW Permit for air-vacuum excavation of 5 utility potholes approximately 12"x12" in size for the design phase of the HSIP HAWK Crossing Projects Package 2 project.
Permit Reviews
Permit Number - TR-ROW-0824-00976
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 5 utility potholes approximately 12"x12" in size for the design phase of the HSIP HAWK Crossing Projects Package 2 project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/30/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/09/2024 | REQUIRES RESUBMIT |
| 10/28/2024 | RIGHT-OF-WAY REVIEW v.4 | 10/28/2024 | APPROVED |
| 10/14/2024 | RIGHT-OF-WAY REVIEW v.3 | 10/16/2024 | REQUIRES RESUBMIT |
| 08/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/27/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00976
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 5 utility potholes approximately 12"x12" in size for the design phase of the HSIP HAWK Crossing Projects Package 2 project.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/20/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/20/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0824-00976
Permit Description: ROW Permit for air-vacuum excavation of 5 utility potholes approximately 12"x12" in size for the design phase of the HSIP HAWK Crossing Projects Package 2 project.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/19/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/19/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/19/2024 | TRSP - ROW - Final | Passed |