Permit: TR-ROW-0824-00964
Permit Details
Apply Date:
08/20/2024
Applicant:
Robert Alday
Description:
PHASE 1: Installation of under ground conduit for City Of Tucson IT, Tucson Water security and DTM fiber infrastructure. Main goal is to connect Kolb Water Reservoir to City network for security. **FROM THE INTERSECTIONS OF KOLB AND GOLFLINKS EAST TO PRUDENCE**
Permit Reviews
Permit Number - TR-ROW-0824-00964
Permit Status: Inspections
Permit Description: PHASE 1: Installation of under ground conduit for City Of Tucson IT, Tucson Water security and DTM fiber infrastructure. Main goal is to connect Kolb Water Reservoir to City network for security. **FROM THE INTERSECTIONS OF KOLB AND GOLFLINKS EAST TO PRUDENCE**
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/03/2024 | RIGHT-OF-WAY REVIEW v.3 | 09/03/2024 | REQUIRES RESUBMIT |
08/22/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/23/2024 | REQUIRES RESUBMIT |
09/03/2024 | RIGHT-OF-WAY REVIEW v.4 | 09/09/2024 | APPROVED |
08/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/21/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00964
Permit Status: Inspections
Permit Description: PHASE 1: Installation of under ground conduit for City Of Tucson IT, Tucson Water security and DTM fiber infrastructure. Main goal is to connect Kolb Water Reservoir to City network for security. **FROM THE INTERSECTIONS OF KOLB AND GOLFLINKS EAST TO PRUDENCE**
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/21/2024 | Traffic control set-up approved between 9AM - 3:30PM |
08/22/2024 | BUS STOP/ ROUTE |
08/22/2024 | PRE-CON/PAVEMENT/SIDEWALK |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0824-00964
Permit Description: PHASE 1: Installation of under ground conduit for City Of Tucson IT, Tucson Water security and DTM fiber infrastructure. Main goal is to connect Kolb Water Reservoir to City network for security. **FROM THE INTERSECTIONS OF KOLB AND GOLFLINKS EAST TO PRUDENCE**
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/16/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | reviewed timeline and safety setup via phone call, job starting in ~2 weeks |