Permit: TR-ROW-0824-00923
Permit Details
Apply Date:
08/13/2024
Applicant:
ANGEL MORALES
Description:
Mill and Repave 18th from 7th to Russell. Pave 3” X 210’L X 25’ W. seal coat Russell 18TH to Stone. They will pave 18th first then seal coat Russel. 24hr closure on 18th for 3 days. Russell 1 day closure for seal coat. ****
Permit Reviews
Permit Number - TR-ROW-0824-00923
Permit Status: Issued
Permit Description: Mill and Repave 18th from 7th to Russell. Pave 3” X 210’L X 25’ W. seal coat Russell 18TH to Stone. They will pave 18th first then seal coat Russel. 24hr closure on 18th for 3 days. Russell 1 day closure for seal coat. ****
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/02/2024 | RIGHT-OF-WAY REVIEW REVISION v.1 | 12/09/2024 | APPROVED |
08/19/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/20/2024 | APPROVED |
08/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/14/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-ROW-0824-00923
Permit Status: Issued
Permit Description: Mill and Repave 18th from 7th to Russell. Pave 3” X 210’L X 25’ W. seal coat Russell 18TH to Stone. They will pave 18th first then seal coat Russel. 24hr closure on 18th for 3 days. Russell 1 day closure for seal coat. ****
Date | Description | Comments |
---|---|---|
08/14/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
08/14/2024 | The following extended traffic control set-up times were approved: | |
08/14/2024 | PRE-CON/PAVEMENT/SIDEWALK | |
08/14/2024 | PROP 411 | |
08/14/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0824-00923
Permit Description: Mill and Repave 18th from 7th to Russell. Pave 3” X 210’L X 25’ W. seal coat Russell 18TH to Stone. They will pave 18th first then seal coat Russel. 24hr closure on 18th for 3 days. Russell 1 day closure for seal coat. ****
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
12/04/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
12/02/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
12/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
12/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
12/09/2024 | TRSP - ROW - Final | Passed |