Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0824-00913
Permit Details
Apply Date:
08/08/2024
Applicant:
Andrew Ruiz
Description:
EPNG maintenance work within an existing Valve Box inside Ajo Way. Work may require the use of a small backhoe to remove a valve (due to weight), repair it, and replace it in same location. EPNG will keep sidewalk open and accessible at all times.
Permit Reviews
Permit Number - TR-ROW-0824-00913
Permit Status: Issued
Permit Description: EPNG maintenance work within an existing Valve Box inside Ajo Way. Work may require the use of a small backhoe to remove a valve (due to weight), repair it, and replace it in same location. EPNG will keep sidewalk open and accessible at all times.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00913
Permit Status: Issued
Permit Description: EPNG maintenance work within an existing Valve Box inside Ajo Way. Work may require the use of a small backhoe to remove a valve (due to weight), repair it, and replace it in same location. EPNG will keep sidewalk open and accessible at all times.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/09/2024 | Traffic control set-up approved between 9AM - 3:30PM |
08/09/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
08/09/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0824-00913
Permite Description: EPNG maintenance work within an existing Valve Box inside Ajo Way. Work may require the use of a small backhoe to remove a valve (due to weight), repair it, and replace it in same location. EPNG will keep sidewalk open and accessible at all times.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass | |
09/18/2024 | TRSP - ROW - Barricade Takedown | N/A | Partial Pass | |
09/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Partial Pass | |
09/18/2024 | TRSP - ROW - Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0824-00913
Permit Description: EPNG maintenance work within an existing Valve Box inside Ajo Way. Work may require the use of a small backhoe to remove a valve (due to weight), repair it, and replace it in same location. EPNG will keep sidewalk open and accessible at all times.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |