Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Apply Date:
08/05/2024
Applicant:
Description:
[B9] Improve ADA accessibility at the Midvale/Valencia NW bus by installing a bus shelter pad.

Permit Reviews

Permit Number - TR-ROW-0824-00889
Permit Status: Inspections
Permit Description: [B9] Improve ADA accessibility at the Midvale/Valencia NW bus by installing a bus shelter pad.
Start Date Submittal Complete Date Status  
08/06/2024 RIGHT-OF-WAY REVIEW v.1 08/07/2024 REQUIRES RESUBMIT Review Details
08/20/2024 RIGHT-OF-WAY REVIEW v.2 08/21/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0824-00889
Permit Status: Inspections
Permit Description: [B9] Improve ADA accessibility at the Midvale/Valencia NW bus by installing a bus shelter pad.
Total Outstanding Activity Conditions - 3
Date Name
08/06/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/06/2024 Traffic control set-up approved between 9AM - 3:30PM
08/06/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0824-00889
Permit Description: [B9] Improve ADA accessibility at the Midvale/Valencia NW bus by installing a bus shelter pad.
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/09/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/11/2024 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PAGE 2 - MIDVALE - VALENCIA_V2.PDF DOCUMENTS VIEW
B9_SITEPLAN_2024.08.05_V1.PDF DOCUMENTS VIEW