[B16] Improve ADA accessibility at the Craycroft and 5th Street NE bus stop by filling the gap between the curb and the sidewalk, redoing the sidewalk, adding a bus shelter pad.
Permit Reviews
Permit Number - TR-ROW-0824-00884
Permit Status: Complete
Permit Description: [B16] Improve ADA accessibility at the Craycroft and 5th Street NE bus stop by filling the gap between the curb and the sidewalk, redoing the sidewalk, adding a bus shelter pad.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/07/2024 | REQUIRES RESUBMIT |
08/20/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/21/2024 | REQUIRES RESUBMIT |
08/21/2024 | RIGHT-OF-WAY REVIEW v.3 | 08/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00884
Permit Status: Complete
Permit Description: [B16] Improve ADA accessibility at the Craycroft and 5th Street NE bus stop by filling the gap between the curb and the sidewalk, redoing the sidewalk, adding a bus shelter pad.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/06/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
08/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
08/06/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0824-00884
Permit Description: [B16] Improve ADA accessibility at the Craycroft and 5th Street NE bus stop by filling the gap between the curb and the sidewalk, redoing the sidewalk, adding a bus shelter pad.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/09/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/09/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||