Permit: TR-ROW-0824-00883
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3526 E FORT LOWELL RD
Address NEW:
3526 E FORT LOWELL RD
Apply Date:
08/05/2024
Applicant:
Brian Conte
Description:
[B17] Improve ADA accessibility at the Fort Lowell and Palo Verse SE bus stop by filling the gap between the curb and the sidewalk, adding a bus shelter pad, and installing a retaining wall.
Permit Reviews
Permit Number - TR-ROW-0824-00883
Permit Status: Complete
Permit Description: [B17] Improve ADA accessibility at the Fort Lowell and Palo Verse SE bus stop by filling the gap between the curb and the sidewalk, adding a bus shelter pad, and installing a retaining wall.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2024 | RIGHT-OF-WAY REVIEW v.3 | 08/21/2024 | APPROVED |
| 08/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/07/2024 | REQUIRES RESUBMIT |
| 08/20/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/21/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00883
Permit Status: Complete
Permit Description: [B17] Improve ADA accessibility at the Fort Lowell and Palo Verse SE bus stop by filling the gap between the curb and the sidewalk, adding a bus shelter pad, and installing a retaining wall.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/06/2024 | BUS STOP/ ROUTE |
| 08/06/2024 | PRE-CON/SIDEWALK |
| 08/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0824-00883
Permit Description: [B17] Improve ADA accessibility at the Fort Lowell and Palo Verse SE bus stop by filling the gap between the curb and the sidewalk, adding a bus shelter pad, and installing a retaining wall.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/09/2024 | TRSP - ROW - Final | Passed | ||
| 09/09/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 09/09/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |