Permit: TR-ROW-0824-00878
Permit Details
Apply Date:
08/01/2024
Applicant:
Andrew Ruiz
Description:
EPNG must perform testing on its pipeline located w/in Ajo Way. Excavations for the test will be made within EPNG's property (Parcel No. 120-06-3720), but additional space for equipment and staging is required w/in the Ajo Way ROW. NO traffic impacts or closures / Signs and work areas only.
Permit Reviews
Permit Number - TR-ROW-0824-00878
Permit Status: Complete
Permit Description: EPNG must perform testing on its pipeline located w/in Ajo Way. Excavations for the test will be made within EPNG's property (Parcel No. 120-06-3720), but additional space for equipment and staging is required w/in the Ajo Way ROW. NO traffic impacts or closures / Signs and work areas only.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/02/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00878
Permit Status: Complete
Permit Description: EPNG must perform testing on its pipeline located w/in Ajo Way. Excavations for the test will be made within EPNG's property (Parcel No. 120-06-3720), but additional space for equipment and staging is required w/in the Ajo Way ROW. NO traffic impacts or closures / Signs and work areas only.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/02/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0824-00878
Permit Description: EPNG must perform testing on its pipeline located w/in Ajo Way. Excavations for the test will be made within EPNG's property (Parcel No. 120-06-3720), but additional space for equipment and staging is required w/in the Ajo Way ROW. NO traffic impacts or closures / Signs and work areas only.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | precon completed by Jose c of cot 8-13-2024. | |
10/10/2024 | TRSP - ROW - Barricade Takedown | Passed |