Permit: TR-ROW-0823-01108
Permit Details
Apply Date:
08/31/2023
Applicant:
Christian Celaya
Description:
The contractor will be installing street light poles for Jesse Soto for Pueblo Gardens Association Neighborhood. Each pole will be done one at a time, it will be through these streets. Sidewalk will be available for pedestrians. Request 90 day permit. Traffic Control 6:00am-6:00pm.
Permit Reviews
Permit Number - TR-ROW-0823-01108
Permit Status: Complete
Permit Description: The contractor will be installing street light poles for Jesse Soto for Pueblo Gardens Association Neighborhood. Each pole will be done one at a time, it will be through these streets. Sidewalk will be available for pedestrians. Request 90 day permit. Traffic Control 6:00am-6:00pm.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/31/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0823-01108
Permit Status: Complete
Permit Description: The contractor will be installing street light poles for Jesse Soto for Pueblo Gardens Association Neighborhood. Each pole will be done one at a time, it will be through these streets. Sidewalk will be available for pedestrians. Request 90 day permit. Traffic Control 6:00am-6:00pm.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/31/2023 | Traffic Control set-up approved between 7AM - 5PM |
| 08/31/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/01/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0823-01108
Permite Description: The contractor will be installing street light poles for Jesse Soto for Pueblo Gardens Association Neighborhood. Each pole will be done one at a time, it will be through these streets. Sidewalk will be available for pedestrians. Request 90 day permit. Traffic Control 6:00am-6:00pm.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2024 | TRSP - ROW - Recurring | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0823-01108
Permit Description: The contractor will be installing street light poles for Jesse Soto for Pueblo Gardens Association Neighborhood. Each pole will be done one at a time, it will be through these streets. Sidewalk will be available for pedestrians. Request 90 day permit. Traffic Control 6:00am-6:00pm.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/07/2024 | TRSP - ROW - Final/Close-Out | Passed |