Permit: TR-ROW-0726-00857
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
6004 E 32ND ST
Address NEW:
6004 E 32ND ST
Apply Date:
07/27/2026
Applicant:
Daniel Perez
Description:
Road Closure to accommodate installation of a New Building Drain/Sewer Line serving a New Single Family Dwelling located at Parcel: 13112069B. Open Roadway and Connect NEW HCS onto Existing 8" Pima County Wastewater VCP Sewer. Backfill with appropriate Soils for Compaction and Replace Asphalt Across the Roadway, Curb-to-Curb and approximately 10ft Width.
Permit Reviews
Permit Number - TR-ROW-0726-00857
Permit Status: Needs resubmittal
Permit Description: Road Closure to accommodate installation of a New Building Drain/Sewer Line serving a New Single Family Dwelling located at
Parcel: 13112069B.
Open Roadway and Connect NEW HCS onto Existing 8" Pima County Wastewater VCP Sewer.
Backfill with appropriate Soils for Compaction and Replace Asphalt Across the Roadway, Curb-to-Curb and approximately 10ft Width.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0726-00857
Permit Status: Needs resubmittal
Permit Description: Road Closure to accommodate installation of a New Building Drain/Sewer Line serving a New Single Family Dwelling located at
Parcel: 13112069B.
Open Roadway and Connect NEW HCS onto Existing 8" Pima County Wastewater VCP Sewer.
Backfill with appropriate Soils for Compaction and Replace Asphalt Across the Roadway, Curb-to-Curb and approximately 10ft Width.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/03/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/03/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |