Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
4717 E BURNS ST
Address NEW:
4717 E BURNS ST
Apply Date:
07/27/2026
Applicant:
Desert Barricade / Eric Horne
Description:
Green Stormwater Infrastructure (GSI), landscaping and irrigation at Burns Park. GSI features include basins, berms, scuppers and appropriate ground covers such as rock mulch, woodchips and seedmix. Irrigation design is for a new, permanent drip system.

Permit Reviews

Permit Number - TR-ROW-0726-00855
Permit Status: In review
Permit Description: Green Stormwater Infrastructure (GSI), landscaping and irrigation at Burns Park. GSI features include basins, berms, scuppers and appropriate ground covers such as rock mulch, woodchips and seedmix. Irrigation design is for a new, permanent drip system.
Start Date Submittal Complete Date Status  
07/29/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00855
Permit Status: In review
Permit Description: Green Stormwater Infrastructure (GSI), landscaping and irrigation at Burns Park. GSI features include basins, berms, scuppers and appropriate ground covers such as rock mulch, woodchips and seedmix. Irrigation design is for a new, permanent drip system.
Total Outstanding Activity Conditions - 5
Date Name
07/29/2026 CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
07/29/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/29/2026 Traffic control set-up approved between 9AM - 3:30PM
07/29/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.