Permit: TR-ROW-0726-00854
Permit Details
Apply Date:
07/27/2026
Applicant:
Desert Barricades LLC
Description:
Sewer repair in area of sidewalk. Sidewalk will need removed and putback.
Permit Reviews
Permit Number - TR-ROW-0726-00854
Permit Status: Complete
Permit Description: Sewer repair in area of sidewalk. Sidewalk will need removed and putback.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0726-00854
Permit Status: Complete
Permit Description: Sewer repair in area of sidewalk. Sidewalk will need removed and putback.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/29/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/29/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0726-00854
Permit Description: Sewer repair in area of sidewalk. Sidewalk will need removed and putback.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Ivan, job will mobilize on Monday 8/10 for a two day job. Backfill will be native material, pedestrian reroute to across the street until sidewalk is restored | |
| 10/06/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/06/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/06/2026 | TRSP - ROW - Final | Passed |