Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address:
2221 E 1ST ST
Address NEW:
2221 E 1ST ST
Apply Date:
07/27/2026
Applicant:
Description:
Need to place storage pod in street

Permit Reviews

Permit Number - TR-ROW-0726-00853
Permit Status: Issued
Permit Description: Need to place storage pod in street
Start Date Submittal Complete Date Status  
07/29/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00853
Permit Status: Issued
Permit Description: Need to place storage pod in street
Total Outstanding Activity Conditions - 4
Date Name
07/29/2026 24 Hours with barricades at PODS REQUIRED AT ALL TIMES 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing stormdrain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement.
07/29/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/29/2026 Traffic Control set-up approved between 7AM - 5PM

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW