Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address NEW:
990 E VALENCIA RD
Apply Date:
07/27/2026
Applicant:
Alexis Rohrer
Description:
Work in vault using crane set up on shoulder of Park Ave outside of Martin Reservoir. ( DTM Note: Continuation of Scope of Work -TR-ROW-0326-00306 (990 E VALENCIA RD TUCSON, AZ 85756) )

Permit Reviews

Permit Number - TR-ROW-0726-00850
Permit Status: Fees due
Permit Description: Work in vault using crane set up on shoulder of Park Ave outside of Martin Reservoir. ( DTM Note: Continuation of Scope of Work -TR-ROW-0326-00306 (990 E VALENCIA RD TUCSON, AZ 85756) )
Start Date Submittal Complete Date Status  
07/28/2026 RIGHT-OF-WAY REVIEW v.1 08/10/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00850
Permit Status: Fees due
Permit Description: Work in vault using crane set up on shoulder of Park Ave outside of Martin Reservoir. ( DTM Note: Continuation of Scope of Work -TR-ROW-0326-00306 (990 E VALENCIA RD TUCSON, AZ 85756) )
Total Outstanding Activity Conditions - 6
Date Name
07/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/10/2026 The following extended traffic control set-up times were approved: 6am -9am & 3:30 pm - 6 pm - With need condition on TCP Plan
08/10/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
08/10/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
08/10/2026 Traffic control set-up approved between 9AM - 3:30PM

Documents

File Name Document Type  
MARTIN RESERVOIR SITE LOCATION_V1.PDF DOCUMENTS VIEW
SMYTH INDUSTRIES - 6596 S PARK AVE - FLAGGER STATION - MARTIN RESERVOIR_V1.PDF DOCUMENTS VIEW