Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address NEW:
2455 W SAN JUAN TR
Apply Date:
07/27/2026
Applicant:
Alex Abril
Description:
Proof CenturyLink existing conduit in manholes. Men and equipment only. No new construction will be performed.

Permit Reviews

Permit Number - TR-ROW-0726-00849
Permit Status: Needs resubmittal
Permit Description: Proof CenturyLink existing conduit in manholes. Men and equipment only. No new construction will be performed.
Start Date Submittal Complete Date Status  
07/28/2026 RIGHT-OF-WAY REVIEW v.1 07/30/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00849
Permit Status: Needs resubmittal
Permit Description: Proof CenturyLink existing conduit in manholes. Men and equipment only. No new construction will be performed.
Total Outstanding Activity Conditions - 3
Date Name
07/29/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/29/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/29/2026 Traffic control set-up approved between 9AM - 3:30PM