Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
5726 E 19TH ST
Address NEW:
5726 E 19TH ST
Apply Date:
07/22/2026
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Potholing for San Fernando future phases 3,4 & 5. This potholing is for design purposes.

Permit Reviews

Permit Number - TR-ROW-0726-00841
Permit Status: Needs resubmittal
Permit Description: Potholing for San Fernando future phases 3,4 & 5. This potholing is for design purposes.
Start Date Submittal Complete Date Status  
07/28/2026 RIGHT-OF-WAY REVIEW v.2 08/17/2026 REQUIRES RESUBMIT Review Details
07/22/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00841
Permit Status: Needs resubmittal
Permit Description: Potholing for San Fernando future phases 3,4 & 5. This potholing is for design purposes.
Total Outstanding Activity Conditions - 7
Date Name
07/28/2026 Traffic Control set-up approved between 7AM - 5PM
07/28/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/28/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/28/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/28/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/17/2026 Potholing operations shall be conducted in a manner that maintains public safety and minimizes impacts to traffic. All excavations shall be properly protected, backfilled, and restored upon completion. The permittee shall be responsible for repairing any settlement or pavement failure resulting from potholing activities at no cost to the City.
08/17/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary