Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address NEW:
7575 E APPLE TREE DR
Apply Date:
07/18/2026
Applicant:
Alyssa Felix
Description:
I received a code Violation for lifted sidewalk. There is 2 areas that need work. A 16x8 and 4x8 area of cement that needs repair. The whole project will take about 2 to 3 days to demo and repair.

Permit Reviews

Permit Number - TR-ROW-0726-00824
Permit Status: Inspections
Permit Description: I received a code Violation for lifted sidewalk. There is 2 areas that need work. A 16x8 and 4x8 area of cement that needs repair. The whole project will take about 2 to 3 days to demo and repair.
Start Date Submittal Complete Date Status  
07/20/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0726-00824
Permit Status: Inspections
Permit Description: I received a code Violation for lifted sidewalk. There is 2 areas that need work. A 16x8 and 4x8 area of cement that needs repair. The whole project will take about 2 to 3 days to demo and repair.
Total Outstanding Activity Conditions - 2
Date Name
07/21/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/21/2026 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0726-00824
Permite Description: I received a code Violation for lifted sidewalk. There is 2 areas that need work. A 16x8 and 4x8 area of cement that needs repair. The whole project will take about 2 to 3 days to demo and repair.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/27/2026 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0726-00824
Permit Description: I received a code Violation for lifted sidewalk. There is 2 areas that need work. A 16x8 and 4x8 area of cement that needs repair. The whole project will take about 2 to 3 days to demo and repair.
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/24/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/27/2026 TRSP - ROW - Barricade Takedown Passed