Permit: TR-ROW-0726-00818
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW)
Address:
5211 E VALENCIA RD
Address NEW:
5211 E VALENCIA RD
Apply Date:
07/15/2026
Applicant:
Blake Junak
Description:
New commercial ground-up drive-thru restaurant with site improvements.
Permit Reviews
Permit Number - TR-ROW-0726-00818
Permit Status: Inspections complete
Permit Description: New commercial ground-up drive-thru restaurant with site improvements.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/15/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 07/24/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/07/2026 | REQUIRES RESUBMIT |
| 08/19/2026 | RIGHT-OF-WAY REVIEW v.3 | 08/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0726-00818
Permit Status: Inspections complete
Permit Description: New commercial ground-up drive-thru restaurant with site improvements.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/28/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/28/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/28/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/28/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
| 08/20/2026 | The following extended traffic control set-up times were approved: 24hrs |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-ROW-0726-00818
Permit Description: New commercial ground-up drive-thru restaurant with site improvements.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Danny, job will be approximately one week long. 24 hour traffic control is allowed as there is no impact to travel lanes. | |
| 09/09/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 09/28/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | no travel lanes require closure for this work, site fence is brought up to back of curb and around all new sidewalk. Area did not previously have pedestrian access and thus no reroute is required. Sidewalk has been poured and will be ready for post pour inspection on Wednesday, upon approval traffic control, devices, and site fence can be removed and access allowed. | |
| 10/08/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | new sidewalk checked and verified for grades and joints, forms have been fully stripped. Sidewalk will be thoroughly swept for dirt and debris. Approved. | |
| 10/22/2026 | TRSP - ROW - Final | Passed | Work within city right of way has been completed |