Permit: TR-ROW-0726-00796
Permit Details
Apply Date:
07/08/2026
Applicant:
Adrian Dominguez
Description:
sidewalk repairs marked by city inspector
Permit Reviews
Permit Number - TR-ROW-0726-00796
Permit Status: Complete
Permit Description: sidewalk repairs marked by city inspector
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0726-00796
Permit Status: Complete
Permit Description: sidewalk repairs marked by city inspector
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/09/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/09/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0726-00796
Permit Description: sidewalk repairs marked by city inspector
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with Adrian, detailed sidewalk and subgrade specs, safety regarding reroutes and saw cut procedures, documentation for pre and post pour, and final approval. Demo began today and will pour new sidewalk tomorrow morning. | |
| 07/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | sidewalk closed for panel replacement, reroutes across the street are in place | |
| 07/22/2026 | TRSP - ROW - Final | Passed | new sidewalk panels in place with expansion joint, site clear of debris and devices, approved |