Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1404 E 10TH ST
Address NEW:
1404 E 10TH ST
Apply Date:
07/31/2025
Applicant:
Description:
325005 - Emergency HCS Repair at 1404 E 10th St. Ellison-Mills Contracting at the direction of PCRWRD repaired the HCS between MH 9907-28 and MH 9907-29.

Permit Reviews

Permit Number - TR-ROW-0725-00977
Permit Status: Complete
Permit Description: 325005 - Emergency HCS Repair at 1404 E 10th St. Ellison-Mills Contracting at the direction of PCRWRD repaired the HCS between MH 9907-28 and MH 9907-29.
Start Date Submittal Complete Date Status  
07/31/2025 RIGHT-OF-WAY REVIEW v.1 07/31/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0725-00977
Permit Status: Complete
Permit Description: 325005 - Emergency HCS Repair at 1404 E 10th St. Ellison-Mills Contracting at the direction of PCRWRD repaired the HCS between MH 9907-28 and MH 9907-29.
Total Outstanding Activity Conditions - 2
Date Name
07/31/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/31/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0725-00977
Permit Description: 325005 - Emergency HCS Repair at 1404 E 10th St. Ellison-Mills Contracting at the direction of PCRWRD repaired the HCS between MH 9907-28 and MH 9907-29.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/18/2025 TRSP - ROW - Final Passed