Permit: TR-ROW-0725-00919
Permit Details
Apply Date:
07/17/2025
Applicant:
Cynthia Smith
Description:
Narrowing E Teton Road to 20 feet width, from the corner of S 6th Ave approximately 620 LF to the street bordering Challenger Middle School. Installing a flush curb. In the ROW we will install a DG pathway, rain water harvesting basins and swales, plants, irrigation and boulders. (Extended Work Hours approval - All work is to be Coordinated with School and TUSD School Administration for Traffic Control Setups and not to impact Bus or Parent access during School Operations.) 10/27/2025 - Request for 60 Day Renewal as of 11/10/2025
Permit Reviews
Permit Number - TR-ROW-0725-00919
Permit Status: Complete
Permit Description: Narrowing E Teton Road to 20 feet width, from the corner of S 6th Ave approximately 620 LF to the street bordering Challenger Middle School. Installing a flush curb. In the ROW we will install a DG pathway, rain water harvesting basins and swales, plants, irrigation and boulders.
(Extended Work Hours approval - All work is to be Coordinated with School and TUSD School Administration for Traffic Control Setups and not to impact Bus or Parent access during School Operations.)
10/27/2025 - Request for 60 Day Renewal as of 11/10/2025
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 10/23/2025 | REQUIRES RESUBMIT |
| 07/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/21/2025 | REQUIRES RESUBMIT |
| 08/13/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 08/13/2025 | APPROVED |
| 08/11/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 08/11/2025 | APPROVED |
| 08/07/2025 | RIGHT-OF-WAY REVIEW v.4 | 08/08/2025 | APPROVED |
| 07/28/2025 | RIGHT-OF-WAY REVIEW v.3 | 08/04/2025 | REQUIRES RESUBMIT |
| 07/22/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/24/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0725-00919
Permit Status: Complete
Permit Description: Narrowing E Teton Road to 20 feet width, from the corner of S 6th Ave approximately 620 LF to the street bordering Challenger Middle School. Installing a flush curb. In the ROW we will install a DG pathway, rain water harvesting basins and swales, plants, irrigation and boulders.
(Extended Work Hours approval - All work is to be Coordinated with School and TUSD School Administration for Traffic Control Setups and not to impact Bus or Parent access during School Operations.)
10/27/2025 - Request for 60 Day Renewal as of 11/10/2025
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/21/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D |
| 08/08/2025 | Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones. |
| 08/08/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 08/08/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/13/2025 | The following extended traffic control set-up times were approved: |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0725-00919
Permit Description: Narrowing E Teton Road to 20 feet width, from the corner of S 6th Ave approximately 620 LF to the street bordering Challenger Middle School. Installing a flush curb. In the ROW we will install a DG pathway, rain water harvesting basins and swales, plants, irrigation and boulders.
(Extended Work Hours approval - All work is to be Coordinated with School and TUSD School Administration for Traffic Control Setups and not to impact Bus or Parent access during School Operations.)
10/27/2025 - Request for 60 Day Renewal as of 11/10/2025
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/18/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 08/21/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/08/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 01/08/2026 | TRSP - ROW - Final | Passed |