Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0725-00886
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
5444 E FORT LOWELL RD
Address NEW:
5444 E FORT LOWELL RD
Apply Date:
07/03/2025
Applicant:
Benjamin Sepulveda
Description:
The contractor will open trench one lane at a time to install electrical conduit PVC for Benjamin Sepulveda for High Quality Electric. Traffic Control Request 7:00am to 3:30pm, 90 day permit.
Permit Reviews
Permit Number - TR-ROW-0725-00886
Permit Status: Complete
Permit Description: The contractor will open trench one lane at a time to install electrical conduit PVC for Benjamin Sepulveda for High Quality Electric. Traffic Control Request 7:00am to 3:30pm, 90 day permit.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0725-00886
Permit Status: Complete
Permit Description: The contractor will open trench one lane at a time to install electrical conduit PVC for Benjamin Sepulveda for High Quality Electric. Traffic Control Request 7:00am to 3:30pm, 90 day permit.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/07/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 07/07/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 07/07/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 07/07/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/07/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0725-00886
Permite Description: The contractor will open trench one lane at a time to install electrical conduit PVC for Benjamin Sepulveda for High Quality Electric. Traffic Control Request 7:00am to 3:30pm, 90 day permit.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0725-00886
Permit Description: The contractor will open trench one lane at a time to install electrical conduit PVC for Benjamin Sepulveda for High Quality Electric. Traffic Control Request 7:00am to 3:30pm, 90 day permit.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/15/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/22/2025 | TRSP - ROW - Final | Passed |