Permit: TR-ROW-0725-00880
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
13010 S HOUGHTON RD
Address NEW:
13010 S HOUGHTON RD
Apply Date:
07/02/2025
Applicant:
James Redding
Description:
Installation of New Aerial and underground pathways for communications. New fiber connection for the Houghton Water Reservoir.
Permit Reviews
Permit Number - TR-ROW-0725-00880
Permit Status: Complete
Permit Description: Installation of New Aerial and underground pathways for communications. New fiber connection for the Houghton Water Reservoir.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2025 | RIGHT-OF-WAY REVIEW v.3 | 07/22/2025 | APPROVED |
| 07/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/02/2025 | REQUIRES RESUBMIT |
| 07/03/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/07/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0725-00880
Permit Status: Complete
Permit Description: Installation of New Aerial and underground pathways for communications. New fiber connection for the Houghton Water Reservoir.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/03/2025 | MULTIPLE JURISDICTIONS |
| 07/03/2025 | PAVEMENT MORATORIUM |
| 07/03/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/22/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/22/2025 | Vertical Message Board to be placed 5 days in advance of work for sections within the City of Tucson Right of Way |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0725-00880
Permit Description: Installation of New Aerial and underground pathways for communications. New fiber connection for the Houghton Water Reservoir.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I met on-site with Robert from Sturgeon and he informed me that a tentative start date would be Monday 08/18/2025. I contacted Dave Morhefka in regards to vegetation that will be impacted due to trenching and he advised Sturgeon to schedule with Tucson cactus and succulent society to remove any cacti from the area before work begins. Robert agreed and will start much further south on the project to allow for the relocation to take place. | |
| 07/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Job has been completed, traffic control removed | |
| 07/23/2026 | TRSP - ROW - Barricade Takedown | Passed | Job has been completed, traffic control removed | |
| 07/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Job has been completed, all restoration was past shoulder on city easement | |
| 07/23/2026 | TRSP - ROW - Final | Passed | all work completed, confirmed with phone call with Robert from Sturgeon and Jeremy from COT. All other inspections completed, job site is clear of debris and devices. |