Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0724-00836
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
9385 S COUNTRY CLUB RD
Address NEW:
9385 S COUNTRY CLUB RD
Apply Date:
07/22/2024
Applicant:
Benjamin Lozano
Description:
Barricade set up for approved PIA T22PI00012 - TAA Alvernon Way-Aeronautical Way - I-2022-014. The project comprises of construction improvements to Aeronautical Way providing approximately a 1,000-foot paved roadway extension with two through lanes, an end cul-de-sac for turnaround, painted center turn lane for future connecting roadways. Construction improvements to the Alvernon Way/Aeronautical Way intersection to provide newly paved through lanes and turn lanes along Alvernon Way. Also, through lanes with a left and right turn along Aeronautical Way. Major elements associated with this project include construction and installation of airside earthen road grading, asphaltic concrete paving, curb and gutter, scuppers; storm drain culverts, security fencing, signage, and pavement markings.
Permit Reviews
Permit Number - TR-ROW-0724-00836
Permit Status: Complete
Permit Description: Barricade set up for approved PIA T22PI00012 - TAA Alvernon Way-Aeronautical Way - I-2022-014. The project comprises of construction improvements to Aeronautical Way providing approximately a 1,000-foot paved roadway extension with two through lanes, an end cul-de-sac for turnaround, painted center turn lane for future connecting roadways.
Construction improvements to the Alvernon Way/Aeronautical Way intersection to provide newly paved through lanes and turn lanes along Alvernon Way. Also, through lanes with a left and right turn along Aeronautical Way. Major elements associated with this project include construction and installation of airside earthen road grading, asphaltic concrete paving, curb and gutter, scuppers; storm drain culverts, security fencing, signage, and pavement markings.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/24/2024 | REQUIRES RESUBMIT |
| 07/26/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0724-00836
Permit Status: Complete
Permit Description: Barricade set up for approved PIA T22PI00012 - TAA Alvernon Way-Aeronautical Way - I-2022-014. The project comprises of construction improvements to Aeronautical Way providing approximately a 1,000-foot paved roadway extension with two through lanes, an end cul-de-sac for turnaround, painted center turn lane for future connecting roadways.
Construction improvements to the Alvernon Way/Aeronautical Way intersection to provide newly paved through lanes and turn lanes along Alvernon Way. Also, through lanes with a left and right turn along Aeronautical Way. Major elements associated with this project include construction and installation of airside earthen road grading, asphaltic concrete paving, curb and gutter, scuppers; storm drain culverts, security fencing, signage, and pavement markings.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/26/2024 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 07/26/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0724-00836
Permit Description: Barricade set up for approved PIA T22PI00012 - TAA Alvernon Way-Aeronautical Way - I-2022-014. The project comprises of construction improvements to Aeronautical Way providing approximately a 1,000-foot paved roadway extension with two through lanes, an end cul-de-sac for turnaround, painted center turn lane for future connecting roadways.
Construction improvements to the Alvernon Way/Aeronautical Way intersection to provide newly paved through lanes and turn lanes along Alvernon Way. Also, through lanes with a left and right turn along Aeronautical Way. Major elements associated with this project include construction and installation of airside earthen road grading, asphaltic concrete paving, curb and gutter, scuppers; storm drain culverts, security fencing, signage, and pavement markings.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/26/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/29/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 11/29/2024 | TRSP - ROW - Final | Passed |